Object
Central Control Power Circuits
The power circuits drive the Inferno Project's drilling rig from Central Control. Stahlman orders technicians to boost them to maximum load, overriding safety protocols despite Petra's warnings and Sutton's skepticism. This surge accelerates the drill's advance toward core penetration, as the Brigadier and Benton witness the escalating crisis amid ticking countdowns and rising alarms.
1 appearances
Purpose
Supply and regulate electrical power for the drilling rig's operation, including accelerated penetration speeds
Significance
Stahlman's command to overload them shatters safety consensus, exposes his unraveling judgment, and locks the project on a path to disaster, straining team bonds under UNIT's watch
Appearances in the Narrative
When this object appears and how it's used