Lytton’s crew prepares the sewer heist route
The jagged access hole breached through the brick wall in the junkyard’s underbrush becomes the physical gateway to the planned sewer infiltration, transforming from a disguised brick facade into a functional entry point. Its rough presence underscores the crew’s tactical adaptation of existing infrastructure for covert access.
Before:
A disguised anomalous brick wall with uneven mortar and salvaged bricks concealed the true entry to the sewer; discrepancies in construction style masked its purpose.
After:
The wall is breached, exposing a vertical breach with damp earth clinging to fractured mortar and scattered debris. It now serves as the acknowledged ingress to the sewers, ready for the crew’s descent.